Subgrade and base
Compacted, tested and proofed before paving.

Land Development & Infrastructure
A neighborhood's streets set its character and carry its traffic. We build roads that meet the plans, pass inspection and hold up.
Call or text today615-431-3789Roads & Streets
A residential street is more than asphalt. It starts with a prepared subgrade, then compacted stone base, curb and gutter, utilities below and finally the paving. Each layer is inspected before the next goes on.
We manage road construction for residential developments across Nashville and Middle Tennessee, coordinating grading, utilities and paving crews so layers are built and tested in the right order. Streets are built to local standards, ready for dedication to the city or county where required.
What you get
Compacted, tested and proofed before paving.
Concrete edges that guide water to inlets.
Asphalt placed and rolled to the specified thickness.
Markings and signage installed where required.
The process
We shape and compact the subgrade and lay stone base.
Curbs go in, then paving crews lay and roll asphalt.
Final inspection leads to acceptance or dedication.
FAQ
It depends on the project and the jurisdiction. Public streets are dedicated to the city or county after inspection.
Often after most home construction, so heavy trucks do not damage it. A base layer carries traffic first.
Local inspectors check each stage, and we run our own checks as well.
Related services
Water & SewerInstalling water mains, sewer lines, manholes and service connections for new lots.Learn more
Sidewalks & TrailsBuilding concrete sidewalks, ramps, crossings and paved or natural trails.Learn more
Finished LotsDelivering build-ready lots with streets, utilities, drainage and final grade.Learn more
Service areas
From Clarksville to Shelbyville and Dickson to Cookeville, pick your city to see the land, development and home building work we handle in your part of Middle Tennessee.
Not on the list? Call 615-431-3789. We take projects across Middle Tennessee.
Call, text or send the form. Tell us about the property, what you hope to build and when you hope to start, and we will take it from there.